Prefabricated housings can be erected on zoned (improved) lands.
Prefabricated housings are erected on concrete ground. Upon your request, a concrete plan is prepared that conforms to the prefabricated structure.
Yes. Our expert team will prepare a concrete plan that conforms to the building you have chosen, which thereafter be submitted to you.
Prefabricated housings can be erected on zoned (improved) lands. Municipalities should grant 5% zoning for their erection on other lands.
It is subject to same taxation as housings or workplaces.
In places that bear village status, one should apply to the relevant body with a certificate of work completion that is accompanied by a permit signed by the village headman and two persons from the board of alderman. If construction is made upon permit by municipality, subscription is made by applying to the relevant body with the certificate of work completion that is added to the zoning report or the construction permit.
As per provisions of Article 20 of the Law on Prefabricated Structures, such structures can only be erected in accordance with the zoning plan, regulation provisions, the license and the addendums thereof.
The main conveyor system of prefabricated structures is metal. Exterior walls and cross partitions are made of Betonpan (precast concrete) panels.
ROCKWOOL, EPS or MINERAL WOOLS is used for thermal insulation. For water insulation, membrane and moisture barrier are used in roof insulation.
Yes
Yes. All standard electricity and water assemblies inside the building are installed by the manufacturer company.
Kitchen sinks and armatures are included in the standard package contents.
Bathroom materials are delivered inclusive of all accessories such as shower tray, pedestal lavatory, flagstones and toilets.
Roof insulation materials are OSB, moisture barrier, membrane and glasswool mattress.
There is no foundation. Optional foundation can be install by using flat mesh concrete between 30-50cm.
It is necessary to complete the permit & license procedures in the municipality and to complete the ground concrete according to the building plan.
Prefabricated buildings are designed according to the modular structure, and procedures can only be performed by considering losses between 10-20% that can occur between assembly and disassembly operations. Although there are no numeric limits, more than 6 assembly/disassembly operations is not recommended in consideration of the building's depreciation.
One important features of prefabricated structure is their rapid production and installation times. Although this changes on a project basis, average housing productions last 4-7 days.
They are produced with consideration of earthquake region conditions.
Projects for prefabricated buildings are prepared with consideration of information like wind speed, snow load, rain ratio etcetera and production is made in the light of such information.
Dye modification is made like the one performed in reinforced concrete structures.